Foundry

Foundry, the build pillar of the Nexus programme: where the cycle software, data and environments are built, scenarios simulated, evidence sealed and each country’s National Portfolio developed.

Where this fits: applied response. Pillar: Foundry. Institution: GCRI, with the Nexus Consortium. Phases: planning to after-action review. Kind: pillar page.

In brief. Foundry is the pillar where the programme builds. It builds the software, data and environments a cycle needs, simulates scenarios and runs benchmarks, monitors hazards, systems and evidence, and develops and tracks each country's National Portfolio. It sends more handoffs than any other pillar: to Nexus Universe the Core Build Report, to Nexus Reports sealed observations and portfolio movement, to Nexus Standards validation evidence, and to Risk Academy the rooms of each system as learning-by-doing courses. It works on the twenty Nexus systems, documented as systems in their own part.

Boundary. "A configured or simulated capability is not a validated result, and a National Portfolio entry is not an investment decision."

Foundry on the hexagon of the six pillars, with the pillars it hands work to or receives work from selected, every handoff among those pillars, and the phases of the programme year in which recorded handoffs happen. Pillars it exchanges no work with are shown unselected.
The Foundry pillar in the programme. A designed programme cycle, not a record of operation. Handoff identifiers F01 to F14 and R1 to R4 as in the sites' pillar model. Source: the sectors and pillars model published on the GCRI, GRF and GRA home pages, vendored and hash-pinned in tools/figures/vendor/nexus-model. As of 2026-10-21.
Figure data (text alternative)
Element
Kind
Description
Value

F01

Handoff in play

Universe to Foundry: Admitted mission becomes a cycle project with a decision case

Readiness preparation

F02

Handoff in play

Foundry to Universe: Core Build Report and go or no-go evidence

Controlled build

F03

Handoff in play

Foundry to Reports: Sealed observations and indicator series behind a profile

Closeout

F04

Handoff

Universe to Reports: After-action and scenario findings for chapters 10 and 13

After-action review

F05

Handoff in play

Foundry to Reports: National Portfolio movement for chapter 11

After-action review

F06

Handoff

Reports to Standards: Method and correction findings as change proposals

Correction

F07

Handoff

Universe to Standards: Docket items that need a standard or a profile

Docket review

F08

Handoff in play

Standards to Foundry: Composed mission profiles and national adoption records

Readiness preparation

F09

Handoff

Standards to Academy: Each adopted standard or profile becomes a course module

Renewal

F10

Handoff

Universe to Academy: Assessed cycle tasks become completion evidence

Closeout

F11

Handoff

Academy to Universe: Qualified participants for the next cycle's roles

Renewal

F12

Handoff

Reports to Universe: Q4 synthesis informs the next-year mandate

Renewal

F13

Handoff in play

Foundry to Standards: Validation and monitoring evidence for conformance review

Controlled build

F14

Handoff in play

Foundry to Academy: Each system's rooms become a learning-by-doing course

Planning

R1

Handoff

Standards to Reports: Applied in editions

Around the ring

R2

Handoff

Reports to Academy: Taught in the open

Around the ring

R3

Handoff

Academy to Labs: Questions become experiments

Around the ring

R4

Handoff in play

Labs to Foundry: Tested prototypes are built

Around the ring

Labs

Pillar

Explore, experiment and prototype

in this route

Foundry

Pillar

Build, simulate and prepare

in this route

Universe

Pillar

Convene and test

in this route

Standards

Pillar

Codify, correct and apply

in this route

Reports

Pillar

Publish in every format

in this route

Academy

Pillar

Teach in the open

in this route

Planning

Phase (Q1, G0)

F14 Each system's rooms become a learning-by-doing course

1 handoff(s)

Readiness preparation

Phase (Q2, G2)

F01 Admitted mission becomes a cycle project with a decision case; F08 Composed mission profiles and national adoption records

2 handoff(s)

Controlled build

Phase (Q2, G3)

F02 Core Build Report and go or no-go evidence; F13 Validation and monitoring evidence for conformance review

2 handoff(s)

Closeout

Phase (Q3, G5)

F03 Sealed observations and indicator series behind a profile; F10 Assessed cycle tasks become completion evidence

2 handoff(s)

After-action review

Phase (Q3)

F04 After-action and scenario findings for chapters 10 and 13; F05 National Portfolio movement for chapter 11

2 handoff(s)

Correction

Phase (Q4)

F06 Method and correction findings as change proposals

1 handoff(s)

Docket review

Phase (Q4)

F07 Docket items that need a standard or a profile

1 handoff(s)

Renewal

Phase (Q4, G7)

F09 Each adopted standard or profile becomes a course module; F11 Qualified participants for the next cycle's roles; F12 Q4 synthesis informs the next-year mandate

3 handoff(s)

How the Foundry pillar works

Twenty systems. The Foundry pillar works on the twenty Nexus systems, each with its command rooms, under their NXS display codes: builds and verification in NXS-FAC (blueprints, builds, verification, signing and assembly), composition in NXS-STU (visual composition, dashboards, forms and workflow experiences), simulation and frontier evaluation in NXS-LAB (research, experiments, simulations and frontier-technology evaluation), canonical data in NXS-GRX (canonical data, provenance, risk and federation) and compute in NXS-COR (compute, nodes, runtimes, placement and infrastructure lifecycle). Each recorded handoff of the programme year is written in a named room of a system, so that what crossed, when and under which gate can be traced.

What it holds. The Foundry pillar owns the projects and builds of each cycle, the observations and canonical data, the simulation and benchmark runs, the National Portfolio record and the evidence seals. The National Portfolio has four views: risk, capability, projects and research, and readiness and handoffs. In the sites' words, "Readiness is fitness for a stated next step… not approval, bankability or certification" (National Portfolio).

Technology at arm's length. The systems the pillar works on are provided under written agreements. No Nexus Standard depends on any provider. GCRI Canada is the lead contracting organization; technology, infrastructure and service providers work with the Nexus Consortium at arm's length and are described by role only: a provider does not operate the programme or direct programme decisions. Licensing terms, title and instruments remain subject to verification and counsel review.

Simulation is not validation. A configured or simulated capability remains a design state until a Universe mission has tested it and its evidence is sealed at gate G5. A National Portfolio entry describes a country's own pipeline in its own terms; it is not an investment decision, and the Foundry pillar never moves money or executes a transaction.

The pillar in the model

The tables in this section are generated from the sites' pillar model, so they match the GCRI, GRF and GRA home pages.

At a glance

What the pillar does, the records it owns, the boundary it keeps and where it is published.

Does

Builds the cycle's software, data and environments; Simulates scenarios and runs benchmarks; Monitors hazards, systems and evidence; Develops and tracks the National Portfolio

Records it owns

Projects and builds; Observations and canonical data; Simulation and benchmark runs; The National Portfolio record; Evidence seals

Boundary

A configured or simulated capability is not a validated result, and a National Portfolio entry is not an investment decision.

On the institutions' sites

Handoffs

The handoffs this pillar sends and receives. Recorded handoffs (F01 to F14) happen in a named phase; ring handoffs (R1 to R4) run continuously.

Id
Direction
Phase
What moves

F01

Readiness preparation

Admitted mission becomes a cycle project with a decision case

F02

Controlled build

Core Build Report and go or no-go evidence

F03

Closeout

Sealed observations and indicator series behind a profile

F05

After-action review

National Portfolio movement for chapter 11

F08

Readiness preparation

Composed mission profiles and national adoption records

F13

Controlled build

Validation and monitoring evidence for conformance review

F14

Planning

Each system's rooms become a learning-by-doing course

R4

From Labs

Continuous

Tested prototypes are built

Through the year

What the pillar does in each quarter and in each phase of the programme year.

Quarter
Edition
What this pillar does

Q1

State and Agenda

Opens cycle projects; National Portfolio baseline

Q2

Evidence and Build

Qualifies sources; one-month controlled build

Q3

Stress Test and Readiness

Runs simulations in Action Week; releases temporary capacity

Q4

Annual Synthesis and Renewal

Supplies data bundles; registers capability gaps

Phase
Quarter
Gate
Work in this phase

Planning

Q1

G0

Opens the cycle projects and takes a baseline of every National Portfolio.

Readiness preparation

Q2

G2

Qualifies data sources and resource offers; builds the scenario models.

Controlled build

Q2

G3

Integrates software and data, signs builds, tests security and interoperability.

Action Week

Q3

G4

Runs simulations and benchmarks and monitors the exercise picture.

Stand-down

Q3

–

Revokes temporary access and releases temporary capacity.

Closeout

Q3

G5

Reconciles equipment, reservations and costs; verifies persistent services.

After-action review

Q3

–

Updates the National Portfolio with measured movement.

Reporting

Q4

G6

Supplies the permitted data bundles behind each edition.

Correction

Q4

–

Re-runs the affected analysis with the corrected inputs.

Docket review

Q4

–

Registers capability gaps as work for the next build.

Network review

Q4

–

Publishes measured capacity results and resource qualification changes.

Renewal

Q4

G7

Carries the National Portfolio and open projects into the next cycle.

At each scale

What the pillar does locally, nationally, regionally and at planetary scale.

Scale
What this pillar does at that scale

Local

Observations and models keep their place: every value carries the location and boundary it was drawn on.

National

Each country's National Portfolio is developed and tracked.

Regional

Shared systems and cross-border dependencies are modelled across the countries of a region.

Planetary

Global data and Earth observation are held with provenance, so planetary pressures can be read alongside national ones.

In each operating area

The fourteen operating areas the programme answers for, as this pillar answers them.

Area
Question
For this pillar

Leadership

Who leads, and on what record.

Each build is led by an authorized project with an accountable owner; leadership is technical and never extends to the decision the build informs.

Strategy

How the year's priorities are set.

The build plan follows the National Portfolio and the missions admitted for the year.

Cadence

When the work happens in the year.

Works all year; the controlled build runs for one month in Q2, and measured capacity results are reviewed in Q4.

Ownership

Which records each pillar owns.

Owns projects and builds, observations and canonical data, simulation and benchmark runs, the National Portfolio record and evidence seals.

Process

How work moves, step by step.

Work moves through governed rooms on twenty systems, and every run leaves a record with its limits.

Development

What is developed, and how capacity grows.

Develops the cycle's software, data and environments, and develops each country's National Portfolio.

Simulations

How scenarios and exercises are run and read.

Runs scenarios, experiments and benchmarks with published method and conditions; a simulated capability is not a validated result.

Reporting

How results reach the public record.

Supplies the permitted data bundles and sealed observations behind every edition.

Governance

Who decides, and what a decision is not.

Shared infrastructure made available to the Consortium for public-good purposes; it holds no vote in the governance of the standards.

Data and evidence

Where the evidence comes from and how it is kept.

Canonical observations and provenance are held in NXS-GRX, and every value carries its source and licence.

Finance and resourcing

How work is resourced and made readable to finance.

Compute and data allocations open per project when their terms and review capacity exist; temporary capacity is released at stand-down.

Risk and assurance

How errors are caught and limits are stated.

Builds are signed and tested for security and interoperability, and accepted for exercise only at gate G3.

Participation

Who takes part, and how.

Stakeholders and service providers may establish their presence for non-profit and consortium objectives under the Terms.

Communication

How each pillar speaks in public.

Public pages describe each system's purpose and design, and state what it does only as far as its record shows.

Applied to the eight contexts

How the pillar would apply to each teaching context of the model, and the measure it would answer for. These are illustrative applications, not delivered projects.

Context
Illustrative application
Measure
Applied

City twin links substations, pumps and clinics to flood depth

Lifelines modelled (higher is better)

yes

Basin twin trades power, flood storage and river flows

Release options tested (higher is better)

yes

Allocation model for irrigation, cooling and drinking water

Demand met in drought (higher is better)

yes

Grid peak and river temperature model for the heat season

Peak hours foreseen (higher is better)

yes

Twin of backup fuel, water treatment and cold chains

Hours of autonomy (higher is better)

yes

Continuity board for clinics, grid and logistics

Services monitored (higher is better)

yes

Yield and diet-quality model by crop

Crops modelled (higher is better)

yes

Coastal twin of ports, substations and water intakes

Assets in the twin (higher is better)

yes

The institutions in this pillar

What GCRI, GRF and GRA each contribute.

Institution
Contribution

GCRI

Its science and technical platforms bring the methods, data and evidence that the Foundry builds on.

GRF

Admits missions and accepts the build for exercise at a recorded gate, so Foundry work enters the programme on the record.

GRA

Brings finance-readiness questions, so builds produce evidence that financial institutions can read.

Read further