Foundry
Foundry, the build pillar of the Nexus programme: where the cycle software, data and environments are built, scenarios simulated, evidence sealed and each country’s National Portfolio developed.
Where this fits: applied response. Pillar: Foundry. Institution: GCRI, with the Nexus Consortium. Phases: planning to after-action review. Kind: pillar page.
In brief. Foundry is the pillar where the programme builds. It builds the software, data and environments a cycle needs, simulates scenarios and runs benchmarks, monitors hazards, systems and evidence, and develops and tracks each country's National Portfolio. It sends more handoffs than any other pillar: to Nexus Universe the Core Build Report, to Nexus Reports sealed observations and portfolio movement, to Nexus Standards validation evidence, and to Risk Academy the rooms of each system as learning-by-doing courses. It works on the twenty Nexus systems, documented as systems in their own part.
Boundary. "A configured or simulated capability is not a validated result, and a National Portfolio entry is not an investment decision."
How the Foundry pillar works
Twenty systems. The Foundry pillar works on the twenty Nexus systems, each with its command rooms, under their NXS display codes: builds and verification in NXS-FAC (blueprints, builds, verification, signing and assembly), composition in NXS-STU (visual composition, dashboards, forms and workflow experiences), simulation and frontier evaluation in NXS-LAB (research, experiments, simulations and frontier-technology evaluation), canonical data in NXS-GRX (canonical data, provenance, risk and federation) and compute in NXS-COR (compute, nodes, runtimes, placement and infrastructure lifecycle). Each recorded handoff of the programme year is written in a named room of a system, so that what crossed, when and under which gate can be traced.
What it holds. The Foundry pillar owns the projects and builds of each cycle, the observations and canonical data, the simulation and benchmark runs, the National Portfolio record and the evidence seals. The National Portfolio has four views: risk, capability, projects and research, and readiness and handoffs. In the sites' words, "Readiness is fitness for a stated next step… not approval, bankability or certification" (National Portfolio).
Technology at arm's length. The systems the pillar works on are provided under written agreements. No Nexus Standard depends on any provider. GCRI Canada is the lead contracting organization; technology, infrastructure and service providers work with the Nexus Consortium at arm's length and are described by role only: a provider does not operate the programme or direct programme decisions. Licensing terms, title and instruments remain subject to verification and counsel review.
Simulation is not validation. A configured or simulated capability remains a design state until a Universe mission has tested it and its evidence is sealed at gate G5. A National Portfolio entry describes a country's own pipeline in its own terms; it is not an investment decision, and the Foundry pillar never moves money or executes a transaction.
The pillar in the model
The tables in this section are generated from the sites' pillar model, so they match the GCRI, GRF and GRA home pages.
At a glance
What the pillar does, the records it owns, the boundary it keeps and where it is published.
Does
Builds the cycle's software, data and environments; Simulates scenarios and runs benchmarks; Monitors hazards, systems and evidence; Develops and tracks the National Portfolio
Records it owns
Projects and builds; Observations and canonical data; Simulation and benchmark runs; The National Portfolio record; Evidence seals
Boundary
A configured or simulated capability is not a validated result, and a National Portfolio entry is not an investment decision.
Public home
On the institutions' sites
Handoffs
The handoffs this pillar sends and receives. Recorded handoffs (F01 to F14) happen in a named phase; ring handoffs (R1 to R4) run continuously.
F01
From Nexus Universe
Readiness preparation
Admitted mission becomes a cycle project with a decision case
Through the year
What the pillar does in each quarter and in each phase of the programme year.
Q1
State and Agenda
Opens cycle projects; National Portfolio baseline
Q2
Evidence and Build
Qualifies sources; one-month controlled build
Q3
Stress Test and Readiness
Runs simulations in Action Week; releases temporary capacity
Q4
Annual Synthesis and Renewal
Supplies data bundles; registers capability gaps
Planning
Q1
G0
Opens the cycle projects and takes a baseline of every National Portfolio.
Readiness preparation
Q2
G2
Qualifies data sources and resource offers; builds the scenario models.
Controlled build
Q2
G3
Integrates software and data, signs builds, tests security and interoperability.
Action Week
Q3
G4
Runs simulations and benchmarks and monitors the exercise picture.
Stand-down
Q3
–
Revokes temporary access and releases temporary capacity.
Closeout
Q3
G5
Reconciles equipment, reservations and costs; verifies persistent services.
After-action review
Q3
–
Updates the National Portfolio with measured movement.
Reporting
Q4
G6
Supplies the permitted data bundles behind each edition.
Correction
Q4
–
Re-runs the affected analysis with the corrected inputs.
Docket review
Q4
–
Registers capability gaps as work for the next build.
Network review
Q4
–
Publishes measured capacity results and resource qualification changes.
Renewal
Q4
G7
Carries the National Portfolio and open projects into the next cycle.
At each scale
What the pillar does locally, nationally, regionally and at planetary scale.
Local
Observations and models keep their place: every value carries the location and boundary it was drawn on.
National
Each country's National Portfolio is developed and tracked.
Regional
Shared systems and cross-border dependencies are modelled across the countries of a region.
Planetary
Global data and Earth observation are held with provenance, so planetary pressures can be read alongside national ones.
In each operating area
The fourteen operating areas the programme answers for, as this pillar answers them.
Leadership
Who leads, and on what record.
Each build is led by an authorized project with an accountable owner; leadership is technical and never extends to the decision the build informs.
Strategy
How the year's priorities are set.
The build plan follows the National Portfolio and the missions admitted for the year.
Cadence
When the work happens in the year.
Works all year; the controlled build runs for one month in Q2, and measured capacity results are reviewed in Q4.
Ownership
Which records each pillar owns.
Owns projects and builds, observations and canonical data, simulation and benchmark runs, the National Portfolio record and evidence seals.
Process
How work moves, step by step.
Work moves through governed rooms on twenty systems, and every run leaves a record with its limits.
Development
What is developed, and how capacity grows.
Develops the cycle's software, data and environments, and develops each country's National Portfolio.
Simulations
How scenarios and exercises are run and read.
Runs scenarios, experiments and benchmarks with published method and conditions; a simulated capability is not a validated result.
Reporting
How results reach the public record.
Supplies the permitted data bundles and sealed observations behind every edition.
Governance
Who decides, and what a decision is not.
Shared infrastructure made available to the Consortium for public-good purposes; it holds no vote in the governance of the standards.
Data and evidence
Where the evidence comes from and how it is kept.
Canonical observations and provenance are held in NXS-GRX, and every value carries its source and licence.
Finance and resourcing
How work is resourced and made readable to finance.
Compute and data allocations open per project when their terms and review capacity exist; temporary capacity is released at stand-down.
Risk and assurance
How errors are caught and limits are stated.
Builds are signed and tested for security and interoperability, and accepted for exercise only at gate G3.
Participation
Who takes part, and how.
Stakeholders and service providers may establish their presence for non-profit and consortium objectives under the Terms.
Communication
How each pillar speaks in public.
Public pages describe each system's purpose and design, and state what it does only as far as its record shows.
Applied to the eight contexts
How the pillar would apply to each teaching context of the model, and the measure it would answer for. These are illustrative applications, not delivered projects.
City twin links substations, pumps and clinics to flood depth
Lifelines modelled (higher is better)
yes
Basin twin trades power, flood storage and river flows
Release options tested (higher is better)
yes
Allocation model for irrigation, cooling and drinking water
Demand met in drought (higher is better)
yes
Grid peak and river temperature model for the heat season
Peak hours foreseen (higher is better)
yes
Twin of backup fuel, water treatment and cold chains
Hours of autonomy (higher is better)
yes
Coastal twin of ports, substations and water intakes
Assets in the twin (higher is better)
yes
The institutions in this pillar
What GCRI, GRF and GRA each contribute.
GCRI
Its science and technical platforms bring the methods, data and evidence that the Foundry builds on.
GRF
Admits missions and accepts the build for exercise at a recorded gate, so Foundry work enters the programme on the record.
GRA
Brings finance-readiness questions, so builds produce evidence that financial institutions can read.
Read further
Programme: the six pillars together.
The programme year: every phase, gate and actor.
The Nexus cycle: from a question to renewal, and who decides.
The model: coupled risk and applied response.
Systems: the twenty Nexus systems.
Sources
GCRI, National Portfolio, as of 2026-10-21.
Pillar model and programme spine of the sites (vendored in the documentation repository,
tools/figures/vendor/nexus-model): the source of every generated table on this page.
Last updated
Was this helpful?