For the complete documentation index, see llms.txt. This page is also available as Markdown.

PROGRAMME

The Nexus programme: six pillars that hand work to one another over one programme year, led by the Nexus Consortium and carried by GCRI, GRF and GRA, each in its role.

Where this fits: the applied-response side of the model. Pillars: all six. Institutions: GCRI, GRF and GRA. Cycle: the whole programme year. Kind: part landing.

In brief. The programme answers coupled risk with six pillars. The Labs pillar explores, the Foundry pillar builds, Nexus Universe convenes and tests, Nexus Standards codifies and corrects, Nexus Reports publishes and Risk Academy teaches. Each pillar hands its work to the next through eighteen recorded handoffs, and the year closes when the findings of one cycle set the mandate of the next. Every pillar is led by the Nexus Consortium. GCRI, The Global Risks Forum (GRF) and The Global Risks Alliance (GRA) each contribute in their own role, and none is the parent, agent or regulator of another (GCRI, GRF and GRA). Nothing on these pages records a running programme: the cycle is a designed specification, no edition has been released, no credential has been issued, and every programme is at service level R0, "information and enquiries" (Programme status).

The six pillars are the same six shown on the right-hand hexagon of the GCRI, GRF and GRA home pages (How Nexus works). The tables on this page are generated from that model, so the documentation and the sites cannot drift apart.

The six pillars of the programme on one hexagon: Labs at the top, then clockwise Foundry, Nexus Universe, Nexus Standards, Nexus Reports and Risk Academy. Fourteen recorded handoffs (F01 to F14) carry work between pillars in named phases of the programme year, and four ring handoffs (R1 to R4) carry it around the ring continuously. With every pillar selected, all eighteen handoffs are in play and seventeen feedback loops close. Underneath, the eight phases of the year in which recorded handoffs happen.
The six pillars and their eighteen handoffs. The same pillar model as the GCRI, GRF and GRA home pages. A designed programme cycle, not a record of operation: no edition has been released and no credential issued. Source: the sectors and pillars model published on the GCRI, GRF and GRA home pages, vendored and hash-pinned in tools/figures/vendor/nexus-model. As of 2026-10-21.
Figure data (text alternative)
Element
Kind
Description
Value

F01

Handoff in play

Universe to Foundry: Admitted mission becomes a cycle project with a decision case

Readiness preparation

F02

Handoff in play

Foundry to Universe: Core Build Report and go or no-go evidence

Controlled build

F03

Handoff in play

Foundry to Reports: Sealed observations and indicator series behind a profile

Closeout

F04

Handoff in play

Universe to Reports: After-action and scenario findings for chapters 10 and 13

After-action review

F05

Handoff in play

Foundry to Reports: National Portfolio movement for chapter 11

After-action review

F06

Handoff in play

Reports to Standards: Method and correction findings as change proposals

Correction

F07

Handoff in play

Universe to Standards: Docket items that need a standard or a profile

Docket review

F08

Handoff in play

Standards to Foundry: Composed mission profiles and national adoption records

Readiness preparation

F09

Handoff in play

Standards to Academy: Each adopted standard or profile becomes a course module

Renewal

F10

Handoff in play

Universe to Academy: Assessed cycle tasks become completion evidence

Closeout

F11

Handoff in play

Academy to Universe: Qualified participants for the next cycle's roles

Renewal

F12

Handoff in play

Reports to Universe: Q4 synthesis informs the next-year mandate

Renewal

F13

Handoff in play

Foundry to Standards: Validation and monitoring evidence for conformance review

Controlled build

F14

Handoff in play

Foundry to Academy: Each system's rooms become a learning-by-doing course

Planning

R1

Handoff in play

Standards to Reports: Applied in editions

Around the ring

R2

Handoff in play

Reports to Academy: Taught in the open

Around the ring

R3

Handoff in play

Academy to Labs: Questions become experiments

Around the ring

R4

Handoff in play

Labs to Foundry: Tested prototypes are built

Around the ring

Labs

Pillar

Explore, experiment and prototype

in this route

Foundry

Pillar

Build, simulate and prepare

in this route

Universe

Pillar

Convene and test

in this route

Standards

Pillar

Codify, correct and apply

in this route

Reports

Pillar

Publish in every format

in this route

Academy

Pillar

Teach in the open

in this route

Planning

Phase (Q1, G0)

F14 Each system's rooms become a learning-by-doing course

1 handoff(s)

Readiness preparation

Phase (Q2, G2)

F01 Admitted mission becomes a cycle project with a decision case; F08 Composed mission profiles and national adoption records

2 handoff(s)

Controlled build

Phase (Q2, G3)

F02 Core Build Report and go or no-go evidence; F13 Validation and monitoring evidence for conformance review

2 handoff(s)

Closeout

Phase (Q3, G5)

F03 Sealed observations and indicator series behind a profile; F10 Assessed cycle tasks become completion evidence

2 handoff(s)

After-action review

Phase (Q3)

F04 After-action and scenario findings for chapters 10 and 13; F05 National Portfolio movement for chapter 11

2 handoff(s)

Correction

Phase (Q4)

F06 Method and correction findings as change proposals

1 handoff(s)

Docket review

Phase (Q4)

F07 Docket items that need a standard or a profile

1 handoff(s)

Renewal

Phase (Q4, G7)

F09 Each adopted standard or profile becomes a course module; F11 Qualified participants for the next cycle's roles; F12 Q4 synthesis informs the next-year mandate

3 handoff(s)

The six pillars

Pillar
Does
Role
Steward
Public home

Explore, experiment and prototype

Where questions become experiments and prototypes: new methods, data and tools are tried in the open, with their limits on record, before the Foundry builds them, under the Nexus Consortium.

The Nexus Consortium

Build, simulate and prepare

Where things are built, simulated and prepared: every output of GCRI, GRF and GRA, under the Nexus Consortium.

The Nexus Consortium

Convene and test

Where everything comes together in the annual programme, with GCRI, GRF and GRA each contributing in its role and capacity.

The Global Risks Forum (programme steward), under the Nexus Consortium

Codify, correct and apply

Where all standards are developed, corrected and applied, in the open, with adoption decided by each jurisdiction.

Nexus Standards, with GCRI Canada as secretariat

Publish in every format

Where all outputs are published, in all formats, across its five sites, each with sources, limits and corrections.

The Nexus Consortium

Teach in the open

Where everything is taught in the open, in real locations and for impact, by learning on real cycle work.

Risk Academy, with GCRI Canada as issuer of record

Each pillar keeps one boundary, quoted on its page. Taken together, the six boundaries are the programme's guarantee that evidence never passes for authority. An experiment is not evidence until it has been rebuilt and tested. A simulated capability is not a validated result. A gate is not a public-authority approval. A validator report is not a conformance claim. An edition is not an official risk register or a sovereign rating. A completion record is not a licence to practise.

Who carries each pillar

The programme is not run by a single organisation. GCRI Canada is Lead Institution, Consortium Secretariat and lead contracting organization. GRF stewards Nexus Universe and records its gates. GRA makes risk evidence readable to finance and insurance and carries out no regulated financial activity. The table gives each institution's contribution to each pillar.

Institution
Role in the programme
Labs
Foundry
Universe
Standards
Reports
Academy

Evidence and build: science, methods, data and the technical work behind every pillar; Lead Institution and Consortium Secretariat.

Runs the experiments: its science and technology teams design prototypes, record the method and publish what failed as well as what worked.

Its science and technical platforms bring the methods, data and evidence that the Foundry builds on.

Its technical office prepares the scientific and data readiness of each mission.

GCRI Canada is publisher of record and secretariat; GCRI stewards the evidence, methods, data and open research behind the standards.

Hosts the canonical Nexus Reports site and publishes evidence on countries, sectors and methods.

Authors courses on methods, data and the Foundry systems, hosted on Risk Academy.

Mandate and convening: stewards Nexus Universe and records each programme gate.

Brings the questions that policy and governance need answered, and admits an experiment to the programme at a recorded gate.

Admits missions and accepts the build for exercise at a recorded gate, so Foundry work enters the programme on the record.

Stewards and governs the programme: the mandate, gates G0 to G7, convening and Action Week.

Convenes participation and keeps the public record of recognition and standing.

Publishes governance analysis and authorises publication of the year's results at gate G6.

Authors courses on governance, policy and programme roles, hosted on Risk Academy.

Finance readability: makes risk evidence readable to finance and insurance.

Brings finance questions to test, so a prototype is tried on evidence that financial institutions can read.

Brings finance-readiness questions, so builds produce evidence that financial institutions can read.

Runs finance-readiness dialogues on what each mission means for finance and insurance.

Makes the standards readable to finance and insurance.

Publishes sector analysis and the finance and insurance readiness series.

Authors courses on finance, insurance and readiness, hosted on Risk Academy.

Decisions about public action are never taken inside the programme. Every step of the Nexus cycle that decides belongs to "the relevant government, operator or licensed institution" (Board and governance).

Pages in this part

From observation to decision

The pillars rest on one evidence path. A signal becomes an observation, the observation becomes governed evidence, and the evidence reaches a competent authority, which alone decides.

Observatories capture a signal and structure it into an observation under Nexus Observatory Protocol. NXS-GRX holds it as governed evidence with quality and provenance, and an evidence review checks it. NXS-EWS may prepare a warning-support candidate and NXS-AAP a trigger check; NXS-DSS assembles a decision-support package. The NXS-NSF policy gate releases it, and NXS-RLS hands it off under written agreements. The competent authority alone decides and issues any warning; corrections return to the observatories.
From observation to decision. Indicative material only, never an official warning; a design of the sequence, not a record of any run. Source: D-V3-0003 and D-V3-0004. As of 2026-10-20.
Figure data (text alternative)
Element
Description
Connected to

Signal captured

Remote, in-situ or edge

Observation

Observation

Under Nexus Observatory Protocol

Signal captured; Governed evidence

Governed evidence

Quality and provenance

Observation; Evidence review

Evidence review

Checked before use

Governed evidence; Warning-support candidate

Warning-support candidate

NXS-EWS; never an alert

Evidence review; Decision-support package

Decision-support package

NXS-DSS with NXS-AAP trigger check

Warning-support candidate; Policy gate

Policy gate

NXS-NSF release

Decision-support package; Lawful handoff

Lawful handoff

NXS-RLS under written agreements

Policy gate; Decision

Decision

The authority alone decides

Lawful handoff; Any warning issued

Any warning issued

By the authority, not by Nexus

Decision

Read further

Sources

  • GCRI, How Nexus works, the six pillars and their handoffs, as of 2026-10-21.

  • GCRI, GCRI, GRF and GRA and Board and governance, the institutions and their decision rights.

  • GCRI, Programme status, the seven-state status machine and service level R0.

  • Pillar model and programme spine of the sites (vendored in the documentation repository, tools/figures/vendor/nexus-model), the source of every generated table on this page.

Last updated

Was this helpful?