For the complete documentation index, see llms.txt. This page is also available as Markdown.

Start here

Start here: who the institutions behind the Nexus programme are, what this documentation is, and the current release status, in plain words.

This documentation describes the Nexus programme: its institutions, doctrine, standards and the target design of its technology. Most pages describe intended designs and draft instruments. Unless a page says otherwise, nothing here records that a system is deployed, that a programme is running or that an agreement has been signed.

The model in one picture

Risks do not arrive one sector at a time, and no single institution answers them alone. The programme rests on two linked models, the same two shown on the GCRI, GRF and GRA home pages. Coupled risk places six sectors (water, energy, infrastructure, food, health and biodiversity) on one hexagon, with the fifteen relations through which a shock in one sector travels into the others. Applied response places the six pillars of the programme (Labs, Foundry, Nexus Universe, Nexus Standards, Nexus Reports and Risk Academy) on the same hexagon, with the eighteen handoffs through which work moves between them over the programme year. Every page in this documentation describes one part of these two models: a sector context, a pillar, a handoff, a phase of the year, or the institutions that carry them.

Two hexagons. Left, coupled risk: in an urban flood, water and infrastructure are hit first; four of the six sectors (water, energy, infrastructure, health) are in play through six of the fifteen relations, and the teaching cascade amplifies the initial shock 2.06 times. Right, applied response: five of the six programme pillars apply to the context (Labs, Foundry, Universe, Standards, Academy), with eleven of the eighteen handoffs between them in play; each pillar answers for one measure, and the cited return on resilient infrastructure is about four to one. Underneath, the eight phases of the programme year in which handoffs happen.
Coupled risk, applied response: urban flood. The same model and values as the GCRI, GRF and GRA home pages. Left: teaching values for a typical city-region, not measurements. Right: illustrative applications and the measure each pillar answers for; values are published benchmarks (World Bank, Lifelines, 2019; Global Commission on Adaptation, Adapt Now, 2019), not forecasts. Source: the sectors and pillars model published on the GCRI, GRF and GRA home pages, vendored and hash-pinned in tools/figures/vendor/nexus-model. As of 2026-10-21.
Figure data (text alternative)
Element
Kind
Description
Value

Water and Energy

Relation in play

Water to energy: cooling water and hydropower (0.6); Energy to water: pumping and treatment (0.5)

0.55

Water and Infrastructure

Relation in play

Water to infrastructure: erosion and flood damage (0.3); Infrastructure to water: pipes, dams and treatment works (0.6)

0.45

Water and Health

Relation in play

Water to health: drinking water and sanitation (0.7); Health to water: utility workforce (0.2)

0.45

Energy and Infrastructure

Relation in play

Energy to infrastructure: power for transport and telecoms (0.8); Infrastructure to energy: transmission and fuel logistics (0.6)

0.70

Energy and Health

Relation in play

Energy to health: hospital power (0.5); Health to energy: grid workforce (0.2)

0.35

Infrastructure and Health

Relation in play

Infrastructure to health: access to care (0.5); Health to infrastructure: workforce for operations (0.3)

0.40

Water

Sector

first hit, then depends on infrastructure for pipes, dams and treatment works

stress 0.86

Energy

Sector

depends on water for cooling water and hydropower

stress 0.37

Infrastructure

Sector

first hit, then depends on energy for power for transport and telecoms

stress 0.83

Food

Sector

outside this context

–

Health

Sector

depends on water for drinking water and sanitation

stress 0.41

Biodiversity

Sector

outside this context

–

Amplification

Cascade

Shock 0.6 at Water and Infrastructure, gain 0.35, 4 rounds; coupling 0.46 of the total

×2.06

F01

Handoff in play

Universe to Foundry: Admitted mission becomes a cycle project with a decision case

Readiness preparation

F02

Handoff in play

Foundry to Universe: Core Build Report and go or no-go evidence

Controlled build

F03

Handoff

Foundry to Reports: Sealed observations and indicator series behind a profile

Closeout

F04

Handoff

Universe to Reports: After-action and scenario findings for chapters 10 and 13

After-action review

F05

Handoff

Foundry to Reports: National Portfolio movement for chapter 11

After-action review

F06

Handoff

Reports to Standards: Method and correction findings as change proposals

Correction

F07

Handoff in play

Universe to Standards: Docket items that need a standard or a profile

Docket review

F08

Handoff in play

Standards to Foundry: Composed mission profiles and national adoption records

Readiness preparation

F09

Handoff in play

Standards to Academy: Each adopted standard or profile becomes a course module

Renewal

F10

Handoff in play

Universe to Academy: Assessed cycle tasks become completion evidence

Closeout

F11

Handoff in play

Academy to Universe: Qualified participants for the next cycle's roles

Renewal

F12

Handoff

Reports to Universe: Q4 synthesis informs the next-year mandate

Renewal

F13

Handoff in play

Foundry to Standards: Validation and monitoring evidence for conformance review

Controlled build

F14

Handoff in play

Foundry to Academy: Each system's rooms become a learning-by-doing course

Planning

R1

Handoff

Standards to Reports: Applied in editions

Around the ring

R2

Handoff

Reports to Academy: Taught in the open

Around the ring

R3

Handoff in play

Academy to Labs: Questions become experiments

Around the ring

R4

Handoff in play

Labs to Foundry: Tested prototypes are built

Around the ring

Labs

Pillar

Flood-depth nowcast from rain gauges and terrain

Warning lead time ↑ 30%

Foundry

Pillar

City twin links substations, pumps and clinics to flood depth

Lifelines modelled ↑

Universe

Pillar

Exercise: keep water and power running through a 1-in-100 flood

Hours to restore ↓

Standards

Pillar

Shared asset records so utilities exchange outage data

Agencies sharing records ↑

Reports

Pillar

City flood profile of exposed lifelines

Assets profiled ↑ $390B

Academy

Pillar

Course for utility and emergency operators

Operators qualified ↑

Value at risk

Cited value

At least, by households and firms in low- and middle-income countries to infrastructure disruptions. World Bank, Lifelines, 2019

$390B a year at least, in infrastructure disruption costs to households and firms in low- and middle-income countries

Return on resilience

Cited value

Net benefit of more resilient infrastructure in developing countries, over the life of the assets. World Bank, Lifelines, 2019

4 : 1 benefit to cost

Avoided loss

Cited value

With 24 hours' warning of a coming storm or heatwave. Global Commission on Adaptation, Adapt Now, 2019

30% less damage with 24 hours' warning of a storm or heatwave

Planning

Phase (Q1, G0)

F14 Each system's rooms become a learning-by-doing course

1 handoff(s)

Readiness preparation

Phase (Q2, G2)

F01 Admitted mission becomes a cycle project with a decision case; F08 Composed mission profiles and national adoption records

2 handoff(s)

Controlled build

Phase (Q2, G3)

F02 Core Build Report and go or no-go evidence; F13 Validation and monitoring evidence for conformance review

2 handoff(s)

Closeout

Phase (Q3, G5)

F03 Sealed observations and indicator series behind a profile; F10 Assessed cycle tasks become completion evidence

2 handoff(s)

After-action review

Phase (Q3)

F04 After-action and scenario findings for chapters 10 and 13; F05 National Portfolio movement for chapter 11

2 handoff(s)

Correction

Phase (Q4)

F06 Method and correction findings as change proposals

1 handoff(s)

Docket review

Phase (Q4)

F07 Docket items that need a standard or a profile

1 handoff(s)

Renewal

Phase (Q4, G7)

F09 Each adopted standard or profile becomes a course module; F11 Qualified participants for the next cycle's roles; F12 Q4 synthesis informs the next-year mandate

3 handoff(s)

Who is who

Role

Lead Institution, Consortium Secretariat and lead contracting organization for the Nexus Consortium and the Nexus systems.

Independent consortium steward with GCRI Canada: leadership, dialogue and Nexus Universe programme governance.

Independent consortium steward with GCRI Canada: the finance, insurance and development-readiness interface. GRA carries out no regulated financial activity.

The Nexus Consortium

The public-good consortium stewarded by GCRI Canada, GRF and GRA. National hosts and anchor institutions run national programmes under written agreements; national counterparts own the agenda, data and decisions.

Technology providers

External parties that work with the Nexus Consortium at arm's length under written agreements, like every other external party. They are described by role only.

GCRI Canada is the Lead Institution, Consortium Secretariat and lead contracting organization. The Global Risks Forum (GRF) and the Global Risks Alliance (GRA) are independent consortium stewards with GCRI Canada: GRF leads dialogue and Nexus Universe programme governance; GRA is the finance, insurance and development-readiness interface and carries out no regulated financial activity. Together they steward the Nexus Consortium. National hosts and anchor institutions run national programmes under written agreements, and national counterparts own the agenda, data and decisions. Technology providers are external parties at arm's length under written agreements, described by role only. The programme works on the twenty Nexus systems, documented as systems.
Who is who in the Nexus programme. Roles in the PPP V5 public wording and the institutional architecture recorded by the owner; counsel review pending. Title, corporate relationships and grants remain subject to verification. Source: PPP V5 public descriptions; institutional architecture recorded 2026-10-11. As of 2026-10-20.
Figure data (text alternative)
Element
Description
Connected to

GCRI Canada

Lead Institution, Consortium Secretariat and lead contracting organization

Global Risks Forum (GRF); Global Risks Alliance (GRA); Nexus Consortium

Global Risks Forum (GRF)

Independent consortium steward: dialogue and Nexus Universe programme governance

GCRI Canada; Nexus Consortium

Global Risks Alliance (GRA)

Independent consortium steward: finance, insurance and development-readiness interface; no regulated financial activity

GCRI Canada; Nexus Consortium

Nexus Consortium

Public-good consortium stewarded by GCRI Canada, GRF and GRA

GCRI Canada; Global Risks Forum (GRF); Global Risks Alliance (GRA); National hosts and anchor institutions; Technology providers

National hosts and anchor institutions

Run national programmes under written agreements

Nexus Consortium; National counterparts

National counterparts

Own the agenda, data and decisions

National hosts and anchor institutions

Technology providers

External parties at arm's length; described by role only

Nexus Consortium; The twenty Nexus systems

The twenty Nexus systems

Documented as systems in the SYSTEMS part

Technology providers

These descriptions follow the PPP V5 public wording and the institutional architecture recorded by the owner on 11 October 2026, with counsel review pending. Title, corporate relationships and grants remain subject to verification and to the applicable instruments.

Release status

  • The release of the Nexus systems is on hold. No page here states that a capability is in production use, certified or offered as a service.

  • There is no single readiness percentage. Whether something is defined, built, tested, observed in operation and accepted are separate questions, and each needs its own evidence.

  • The twenty systems are documented as systems, by their NXS codes, in the Systems part. Technology, infrastructure and service providers work with the Nexus Consortium at arm's length under written agreements and are described by role only.

Whether a capability is defined, built, tested, observed in operation and accepted are separate questions, and each needs its own evidence. A release then needs an owner release decision, and the release hold is in force: no capability is presented as ready, certified or official, and no single readiness percentage is given. Corrections return to the definition.
Release status: separate questions, no percentage. Each box is a question answered by its own evidence, not a step on a progress bar. The release hold is in force. Source: Release hold policy and documentation standard NDS-2.10. As of 2026-10-20.
Figure data (text alternative)
Element
Description
Connected to

Defined

A specification exists and is reviewed

Built

Built

An implementation exists for the specification

Defined; Tested

Tested

Tests pass against the specification

Built; Observed in operation

Observed in operation

Recorded evidence from real operation

Tested; Accepted

Accepted

Accepted by a named, accountable approver

Observed in operation; Owner release decision

Owner release decision

A recorded human decision

Accepted; Release hold

Release hold

In force: nothing is presented as ready, certified or official

Owner release decision

How to read these pages

  • Pages marked draft or legal review required explain; they create no rights or obligations.

  • Charters, bylaws and statutes are kept as records. Their text changes only with a recorded owner approval.

  • Corrections are published as new dated versions.

Where to go next

  • Knowledge: how this documentation is organised and how to read it.

  • Organization: the institutions and their roles.

  • Acceleration: the target design of the technology, and the limits on every claim.

Last updated

Was this helpful?